SuperStor SSU-80 Instrukcja Użytkowania i Eksploatacji

Przeglądaj online lub pobierz Instrukcja Użytkowania i Eksploatacji dla Grzejniki wodne i kotły SuperStor SSU-80. SuperStor SSU-80 Use and Care Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 24
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
RESIDENTIAL COMMERCIAL
HEAT TRANSFER PRODUCTS
INDIRECT FIRED WATER HEATERS
Heat Transfer Products, Inc., reserves the right to make product changes or updates without notice.
Heat Transfer Products will not be held liable for typographical errors in literature. For questions, please consult the factory.
Przeglądanie stron 0
1 2 3 4 5 6 ... 23 24

Podsumowanie treści

Strona 1 - INDIRECT FIRED WATER HEATERS

RESIDENTIAL COMMERCIALHEAT TRANSFER PRODUCTSINDIRECT FIRED WATER HEATERSHeat Transfer Products, Inc., reserves the right to make product changes or up

Strona 2 - WARNING

10PLUMBING AND WIRING(Optional to save additional energy dollars) In the bottom of the tee (branch) vertically down,install an NPT tube adapter. Then

Strona 3 - ULTRA RESIDENTIAL SERIES

11PLUMBING AND WIRINGPRESSURE DROP SIZING FOR CIRCULATORYou must have a flow rate, from chart on page 3, on the boiler circulator for the water; orthe

Strona 4

12TYPICAL INSTALLATIONSTYPICAL INSTALLATION USING ZONE VALVESTYPICAL EXPANSION TANKTYPICAL MIXING VALVE

Strona 5 - WALL TANKS

13TYPICAL INSTALLATIONSTYPICAL INSTALLATION USING CIRCULATORSTYPICAL INSTALLATION USING A ZONE VALVE (3-WAY)

Strona 6

14TYPICAL INSTALLATIONSTYPICAL DP INSTALLATIONSSUPERSTOR WITH STORAGE TANK TYPICAL INSTALLATION

Strona 7

15TYPICAL INSTALLATIONSMULTIPLE TANK INSTALLATIONSTYPICAL STEAM BOILER

Strona 8

16WIRING DIAGRAMSZONING WITH CIRCULATORS WITH R845 RELAYZONING WITH CIRCULATORS USING R8182D AND D.P.S.T. NO RELAY REQUIRED

Strona 9

17WIRING DIAGRAMSZONING WITH CIRCULATORS USING L8124 A, C AND R845A RELAYZONING WITH CIRCULATORS USING L8124 E,F AND D.P.S.T. CONTROL. (NO RELAY REQUI

Strona 10 - DANGER

18WIRING DIAGRAMSZONING WITH CIRCULATORS WITH R182D AND R845A RELAYUSING CONTROL WITH BUILT IN IDPST SWITCH WITH NO RELAY REQUIRED

Strona 11

19WIRING DIAGRAMSZONING WITH CIRCULATORS USING L8124 A, C AND R845A RELAYZONING WITH CIRCULATORS USING L8124 A,C AND D.P.S.T. (NO RELAY REQUIRED)

Strona 12 - TYPICAL INSTALLATIONS

USING THIS MANUAL2DANGER DANGER indicates an imminently hazardoussituation which, if not avoided, will result indeath or serious injury.WARNING WARN

Strona 13

20WIRING DIAGRAMSUSING L8148A OR L8152A COLD START BOILER CONTROL WITH CIRCULATORSPRIORITY ZONE WITH CIRCULATORS

Strona 14 - TYPICAL DP INSTALLATIONS

21WIRING DIAGRAMSUSING L8148A OR L8152A COLD START BOILER CONTROL WITH ZONE VALVESPRIORITY ZONE WITH ZONE VALVES

Strona 15 - TYPICAL STEAM BOILER

22TROUBLESHOOTINGTROUBLESHOOTING YOUR SUPER STOR ULTRANO HOT WATERNOT ENOUGH HOT WATERT & P VALVE DISCHARGES:MELBORPNOITULOSELBISSOPGNINEPOTONEVLA

Strona 16 - WIRING DIAGRAMS

23HOT TUBS, SPAS, MULTIPLE SHOWERS, HIGH DEMANDTROUBLESHOOTINGWARNING When raising tank temperature, you increase the risk of scalding – Please use a

Strona 17

© Copyright 2006, 2005 Heat Transfer Products, Inc. LP-83 REV. 1/1/07

Strona 18

3CUTAWAY ILLUSTRATIONINTRODUCING THE NEW SUPER-STOR ULTRASPECIFICATIONS AND PERFORMANCE RATINGSULTRA RESIDENTIAL SERIES*DOE TEST METHOD BASED ON 90°F.

Strona 19

4SPECIFICATIONS AND PERFORMANCE RATINGS*DOE TEST METHOD BASED ON 90°F. TEMPERATURE RISE, 50°/140° W/ BOILER WATER AT 180°FNOTE: TANK RECOVERY FROM COL

Strona 20

5REDUCED BOILER INPUT SIZING GUIDENOTE: IT IS NOT RECOMMENDED TO REDUCE BOILER INPUT WHEN USING DOUBLEWALL TANKS.SUPERstor’s PRODUCT LINE CONSISTS OF

Strona 21

6PERFORMANCE AND SIZING GUIDELINESDETERMINE AMOUNT OF DOMESTIC HOT WATER NEEDED, THEN USE THE CHARTSBELOW TO OPTIMIZE SUPER STOR ULTRA V.S. BOILER SIZ

Strona 22

7LOCATION AND OPERATIONNOTE: MINIMUM BTU/H REQUIRED TO ACHIEVE FIRST HOUR RATINGLOCATIONChoose a location for your water heater centralized to the pip

Strona 23

8PLUMBINGPLUMBINGIt is mandatory that all plumbing is done is accordance with all local and state plumbingcodes, or warranty will be voided. It is als

Strona 24

9PLUMBING AND WIRINGCOLD WATER INLETUse both thread tape and pipe dope and connect an NPT brass tee. On the run, install abrass drain valve. In the br

Komentarze do niniejszej Instrukcji

Brak uwag